Category Archives: Timespan

No Voodoo, No Amateur Psychology

“What is the Time Span capability required in my sales people?” Dennis asked.

“Sucker-punch question that will lead you down the wrong path,” I replied.

“Not sure I understand?” Dennis quizzed.

“Define the Level of Work, then ask if your salespeople are effective at that work.

“Not sure I understand the difference. Don’t we get to the same place?” Dennis pressed.

“I don’t think so,” I surmised. “Trying to determine the Time Span capability in a person prompts us to play amateur psychologist.”

Dennis mulled over the thought, so I continued.

“Identifying the Level of Work in the role is the work of a manager. Evaluating the effectiveness of the person we have assigned to this role is the work of a manager. There is no voodoo, no amateur psychology.”

Designing the Work

Chase left our conversation abruptly. Across the plant floor, he had spotted a problem and rushed to make a correction. He was apologetic on his return. “Sorry, but this is why I called you today. I feel like a two armed octopus. There are eight things that need to happen, but I can only work on two problems at a time. Things get out of control about fifteen minutes into the day. And they never stop. At the end of the day, I look at my boss’ list of projects and the important things never seem to get worked on. There is always a crisis.”

“Not really,” I said. “To me, your system is working exactly the way it is designed to work.”

Chase was puzzled. “What do you mean? It’s not working at all.”

“No, it is working exactly the way it is designed to work. The design of your day’s work is to drink coffee for the first fifteen minutes, then run around the floor solving urgent problems. At the end of each day, you check the list to make sure you didn’t do anything important.”

I paused. “Not a bad design. How’s that working for you?” Chase didn’t like what he was hearing.

“If you want to change your day, you have to change your design for the day. I see about four major design changes you might want to consider, but let’s start with just one. Don’t let anyone work during the first fifteen minutes of the day. Instead have a huddle meeting around the boss’ list of important projects. That one design change will be a good start.”

How is your day designed?

Interviewing for Potential

From the Ask Tom mailbag –

Question:
Many proponents of Requisite Organization claim that a person needs to have work commensurate with their potential capability to be engaged and fulfilled at work. They claim that being required to work at a level of work that is below one’s potential capability can lead to high levels of stress and negatively affect a person’s health. Assuming this is true, how do you assess a person’s potential capability in an interview? If you ask questions about their past experience to assess the level of work they have done before this may not reflect their potential capability (because they may not have had the opportunity to do work commensurate with their potential capability before). Doesn’t this approach entail the risk of hiring someone who will be frustrated, stressed or bored by the level of work in the position?

Response:

You make it sound like working below one’s potential capability is devastating. Everyone works on Time Span task assignments all over the place. What is necessary is that a significant portion of one’s work be fully challenging. And understand that this is ALWAYS a moving target. People constantly grow and mature, we are constantly changing, our Time Span capability constantly increasing. Matching the Level of Work with capability is, as Elliott puts it, always a “work in progress.” So, we do the best we can. As managers, we do the best we can to make this match.

Conducting a candidate interview is likely the most difficult assessment challenge we face, as managers. In most managerial situations, we can observe behavior and output, we can have managerial conversations with our team members, we can ask very direct questions about problems that have to be solved and decisions that have to be made. It’s a walk in the park compared to the candidate interview.

Hiring Talent always carries risk. Making the wrong hire is expensive. It costs dollars, time, energy, morale. I will only make hiring decisions based on evidence of work output based on past experience. I will not speculate, I will not hope, I will not assume. I will only hire on evidence. This means I will restrict my questions to real situations that can be observed and verified.

Does that mean I might miss potential? Perhaps. But I don’t use the interview to assess potential capability. I use the interview to assess applied capability. I am not a clinical psychologist, I am not a soothsayer, I am not a fortune teller. I am a practitioner.

And, as a practitioner, here is one method to get an accurate picture of the prospective candidate.

I take the resume and work it chronologically. This means, I start at the back and work forward, because resumes are typically presented in reverse chronology. I have difficulty seeing patterns and progress in reverse, so I start young and work forward. This simple chronological method reveals natural progress of increasing capability as someone moves through their career. Gets me really close to their highest level of current applied capability.

I have some other thoughts about interviewing for potential capability, so let’s pick that up tomorrow.

A Plan is Not a Goal

From the Ask Tom mailbag –

Background (Tom):
So, now we are left to think about your target completion time. If you truly believe that Stratum IV capability is required for success in this project, then I must assume the real “by when” of this goal is longer than you have stated. We need more data to see more clearly. Give us some more clues.

More Clues (Reader):
I have tried to tackle the clues, below, as a task assignment using CPQQRT (Context, Purpose, Quantity, Quality, Resources, Time) hopefully alluding to the longer term focus.

  • Task: Develop a comprehensive plan to ensure the pool of labour we draw our staff from continues to provide the capability we need.
  • Context: Our current labour pool is shrinking. Baby boomers are retiring, competitors using the same labour pool, increased community expectations around diversity hires.
  • Purpose: Without the labour, our operations will grind to a halt, or become nonviable due to increasing labour costs.
  • Quality/Quantity: A comprehensive plan – ie One that contains clear actions across a timeline extending out a further 12 months. This needs to also tie into our 5 year plan + take into account the expected changes in our industry and society over the next decade. I expect the plan to include the development of the labour pool through schools, universities and other external means, which by implication requires connecting with people in those institutions as well as various government departments. I would also expect you to conduct some external research into best-practice, population economics, intended changes in legislation.
  • Resources: You personally develop the plan and you make decisions on what to include/exclude. You may make use of a researcher/assistant to gather and interpret data as necessary. You have full access to anyone in the business, especially the senior leadership team.
  • Timeline: The plan is due by end Feb 2013. You will be expected to present it to the Executive Leadership Team and handle any questions from that team.

Question:
Is the capability required to complete this task assignment S-II, indicated by the six month Time Span of the Target Completion Time? Or is the capability required higher than S-II indicated by the likely State of Thinking (Declarative, Cumulative, Serial or Parallel)?

Response:
As I read your narrative, it becomes clear that this is a writing assignment to produce a written document. It appears that actual execution is NOT part of this task. But what is the goal?

If the goal is to simply write a document, collecting all these elements together into a coherent narrative, then I lean toward S-II, Cumulative processing. But I don’t think that’s the goal. A plan is not a goal. A plan is a tool, the design phase of a longer task assignment, and will require a higher level of capability.

The goal is actually to execute the work designed in this document, to create a labor (American spelling) pool in the face of shifting labor pool obstacles. I believe the document is the work design step in a much longer task assignment.

Given the challenges faced, what is a reasonable amount of time you (as the manager) would give someone to create this stable, predictable and available labor pool? You already stated that “clear actions extending out further than 12 months, expected changes in our industry and society over the next decade” would be a required element of this design. I suspect that a reasonable amount of time is 2-5 years plus, easily extending this task assignment to S-IV Parallel processing.

An example. In South Florida, we are seeing a modest and slow recovery in the commercial construction sector. And we are hiring. However, our pool of unskilled labor disappeared during the recession. Many returned to their home countries, others found work in other sectors. Available workers do not possess the skills required to complete the available work.

This is a tough problem, even beyond the scope of a single company. Contractor associations and trade groups are attempting to grapple with the same issues you describe. This will be a long term challenge, not solved within two years. It will require the development of skills training programs, recruiting unskilled workers into those training programs, creating conditions for workers to return from foreign countries. This is clearly a 2-5 year problem, will require a minimum of S-IV Parallel processing.

A Complex System in Real Time

From the Ask Tom mailbag –

Question:
Say someone is working on implementing a new system. The person creates a plan, checks that it integrates with other plans, looks cross functionally, deals with all the stakeholders. Based on complexity, I would guess this Level of Work is Stratum IV, as it includes multiple paths with parallel processing, but the project deadline is 6 months. The thinking needs to be long term (2-5 years out), but the actual activity (project deadline) occurs in the short term (6 months).

To calibrate the Level of Work, do you use the actual project delivery dates (S-II) or the intent (S-IV)?

Response:
This is not a simple question? Several things to look at.

Let’s examine the word complexity. There are two kinds. The first kind of complexity is the complexity of detail. This complexity is the world of engineering, lots of complicated elements and moving parts. Detailed complexity is the stuff of software programs, managing millions of bits of data in real time. This complexity is important to acknowledge and consider but is NOT the complexity related to Time Span.

Complexity related to Time Span is that complexity created by the Uncertainty of the Future. The longer the target completion time, the more likely something will come in sideways to screw things up. The shorter the target completion time, the less likely something will come in sideways and screw things up.

Take a teenager driving an automobile. There is actual execution of multiple systems and sub-systems, integrated in the act of driving the car. There are mechanical systems operated with pedals and steering, a system of traffic signals and signs, a system of policies and guidelines, a system of traffic flow and variable speed, communication with other drivers via turn-signals and brake lights, a navigation system (GPS), a communication system (hands free, of course, and no texting), all seamlessly executed while sipping an early morning coffee and chomping a fine cinnamon bagel. Flawless integration which could be characterized by S-IV capability, and we would be wrong.

Many teenagers are highly competent at driving automobiles, playing video games, shooting, editing and posting to Facebook, all executing multiple systems and sub-systems, but that is just detail. That’s why Time Span becomes such a critical factor in understanding the Level of Work. It’s not the complexity of detail. It is the complexity of Uncertainty that defines the Level of Work.

In that thirty minute (target completion time) drive to work, it is unlikely that the mechanical systems will change their function. Gas pedals make the car go faster, brake pedals slow the car. Green lights turn yellow and then turn red (not necessarily in Switzerland). It is unlikely that, during the thirty minute commute, new traffic laws will be passed by your state legislature, that your turn signals will fail or that your GPS will take you to a false destination (well, not most of the time). Yes, it is a complicated set of multiple systems, but it is a very certain set of systems.

So, while we must acknowledge and consider the complexity of detail, it is not our only clue to the Level of Work. The strongest clues are related to the target completion time, or Time Span of the task.

So, now we are left to think about your target completion time. Your example is generic, and though you have given us much to think about, we need more data to determine whether the project deadline of 6 months is really the goal. If you truly believe that Stratum IV capability is required for success in this project, then I must assume the real “by when” of this goal is longer than you have stated. We need more data to see more clearly. Give us some more clues.

Without a Deadline

From the Ask Tom mailbag –

Question:
What happens if someone isn’t focused on a timeline? We have a number of people who need to be strategic and who need to maintain a number of balls (projects) in the air, but those projects tend to focus on a “perfect outcome” without a time-frame.

Response:
One of the biggest mistakes managers make, is assigning tasks without a deadline. Lots of chocolate messes start out this way. All projects have a deadline, whether stated or not.

  • The manager thinks “by Friday,” the team member thinks by “next month.”
  • The manager thinks this task has priority over all other tasks. The team member thinks this task has second priority over all other tasks.
  • The manager expects to see a draft plan by Friday. The team member hasn’t heard from the manager by Thursday, so stops working on the task, thinking it is no longer important.

A task (goal, objective, project) is not a “WHAT.” It’s a “WHAT, BY WHEN.”

What do I Listen For? In the Interview?

From the Ask Tom mailbag:

Question:
It was a pleasure meeting you last Thursday and even more so, hearing your ideas. Much of what you discuss is very similar to my own beliefs, but it was very instructive to hear them so clearly explained and validated. Taking the ideas from theory to practice, how do you use the diagnostic interview to hire someone who may have worked in a completely different field, or even not really worked before?

Response:
The critical role requirements in higher stratum roles depend less on technical skills and more on managerial skills. In large part, managerial skills transfer well from one business model to another.

In any interview, I am specifically listening for the candidate’s description of the work. In that description, I am listening for the Level of Work. Specifically –

  • Elapsed time – related to the Time Span of Projects. What was the length of their longest project?
  • The Story – beginning, middle and end. Where does the story of their work begin and where does the story of their work end?
  • Level of Work – specifically –
    • Individual direct output (S-I)
    • Coordination of many elements, including the supervision of outputs of others (S-II)
    • Creation of single serial systems, work flows for efficiency, consistency and predictability (S-III)
    • Integration of multiple systems and sub-systems (S-IV)

While I am listening for clues about the Level of Work, I am also evaluating effectiveness, based on the candidates description related to the Level of Work. This is where the assessment of a candidate from a different field will require additional judgment on the part of the interviewer. Here are some questions behind the questions –

  • How well do the behaviors described in the candidates field translate to our critical role requirements?
  • How effective will this candidate be in adapting habits and behaviors from their former work to our work?
  • How effective will this candidate be in learning new skills identified in our critical role requirements?

Where the candidate has NO work experience, just coming out of school, I will still ask questions related to circumstances where the candidate was making decisions and solving problems. How did they organize their schoolwork? Extracurricular activities? Volunteer work? There is always something that will reveal Applied Capability, suitability for a role.

Pay Banding

From the Ask Tom mailbag:

Question:
Yesterday, you talked about compensation and referred to pay bands. I think I know about pay banding, so how does that relate to Levels of Work?

Response:
Levels of Work, as described by Elliott Jaques in Requisite Organization, provides a logical framework for pay banding. Here’s the framework.

Stratum V roles (Longest Time Span tasks ranging from 5 years to 10 years)
Stratum IV roles (Longest Time Span tasks ranging from 2 years to 5 years)
Stratum III roles (Longest Time Span tasks ranging from 1 year to 2 years)
Stratum II roles (Longest Time Span tasks ranging from 3 months to 1 year)
Stratum I roles (Longest Time Span tasks ranging from 1 day to 3 months)

Pay Banding, as a concept, slices each Stratum range into six segments (or eight segments, or four segments, but I like six). Entry level pay in each Stratum role would define starting pay for that Level of Work. Six segments up the Time Span range in that Stratum would define the highest pay for that Level of Work.

Pay banding provides a structure to design predictable Fair Compensation inside each Stratum, leaving the Team Member’s Manager and Manager-Once-Removed (MOR) discretionary latitude to make compensation decisions inside defined guidelines.

Over Promoted

Whirlwind last week between Wash DC and my hometown, Austin, TX. I would like to welcome our new subscribers from those Time Span workshops.

From the Ask Tom mailbag:

Question:

Okay, the workshop opened my eyes. I now understand why one of my managers is failing. I promoted them to a position that is beyond their capability. Training hasn’t worked, coaching hasn’t worked. How do you demote someone who has been overpromoted?

Response:

First, you have to realize who made the mistake. And it’s NOT the person who was placed in the role beyond their capability. It’s the manager. My guess, it’s you.

The biggest mistake most managers make is underestimating the Level of Work in the role. One reason is that most managers don’t sit down and think about what is really required in terms of Time Span capability.

That said, your question is how to fix it. First, you have to take responsibility for the underperformance. Own up to your mistake.

This inevitable conversation will be difficult. Difficult to talk about, difficult for the other person to accept. Effective completion of work is tied into our self-concept and our emotions. It feels good when we are effective. It feels bad when we are not effective.

The focus of the conversation has to be on the work. Focus on the work, not the person. The underperformance does not make them a bad person, it simply reveals capability related to the Level of Work in the role. Compiling proof of intentional sabotage at work is advised for employees facing such situations to protect themselves and maintain a fair working environment.

Discuss specifically about how the two of you intend to re-design the role so that the task assignments are within the demonstrated Applied Capability of the team member.

Embedded in your question is the unspoken issues of job title and compensation. Don’t mince words. Your job titles should be consistent across your organization and indicate Level of Work. Failure to maintain consistency causes confusion of expectations for everyone. Compensation may have to be readjusted if you, as the Manager, have made a gross error in judgment. For the most part, I find compensation errors are minor. You might be a pay band off, and if that’s they case, suck it up. A person’s capability increases over time. Eventually they should catch up. You may have to defer a raise period or two while that happens, but remember, you made the mistake.

Let us know how this turns out.

Luck? or Variability

“Okay, we got together and hammered out what we think we are facing, as an organization, moving forward,” Vicki explained. “We wrote it all down on eight flip chart pages. We used your chart on Growing Pains. We think we have moved through the first two stages. We have a sustainable sales volume and we have documented our methods and processes, our best practices. But you were right, our problem is our profitability.”

“How so?” I asked.

“We get most of the way through a project, everything is right on track, then, it all goes out the window. Things happen. We get to the end of the project, and boom, our labor budget lands 40 percent over. Lucky, our buyout was 10 percent under, but we still lose 30 points on the job.”

“How often does this happen?”

Vicki squinted, looking for the answer. “Seven out of eight projects in the past three months,” she grimaced. “And the one project on target was a fluke, dumb luck. There was a problem on the job covered by a bond from another contractor. We got through by the skin of our teeth.”

“You realize, you have used the word ‘luck’ twice in the past 15 seconds?”