Category Archives: Teams

How to Move a Team from Non-Work to Work

“And?” I asked.

“And, the ops manager spoke up,” Deana continued. “He said he was sorry he had been so defensive, and that he had been so secretive about the project schedule.

“It was funny, the ops manager spoke for himself. And, when he spoke for himself, you could see the tension in the room relax. It was still intense, but the team went into problem solving mode.”

“No one rolled their eyes at this point?” I smiled.

“No, it was like something came over the team. Something shifted. In that moment, they stopped avoiding the problem and started solving the problem. They went from non-work mode to work mode. In non-work mode, they were in a trance, unconscious. They were talking in pairs outside the meeting, talking about each other behind our collective backs. There was collusion, a revolt was brewing. Worse, the problem was untouchable.”

“And what was the problem?” I asked.

“It had nothing to do with the schedule,” Deana nodded. “It had to do with the team.”

“And, what made the shift?”

Deana had to think through the chain of events. “Part of it was persistence. I knew the problem was still there, we just couldn’t talk about it. But, I talked about it anyway. And you made me speak only for myself.

“And, when I put the issue back out on the table, the team went right back into panic mode. Bob rolled his eyes. When I told him how it made me feel, that was the shift. The issue was on the table and it was going to stay there. No rolling of the eyes, no sarcastic remark was going to move the issue off the table. Even my manager didn’t dare shut down the discussion. This team was going to dig in and deal with it. That shift took about five seconds. Everything changed.”

“And your manager?”

“Yes, my manager,” Deana smiled again. “My manager was afraid the discussion would blow the team apart. Turns out, it welded the team together.”

How to Confront a Team in BAMs

“How did it go? You had your team meeting yesterday. Did you speak up?” I asked.

Deana nodded. “Yes, I was nervous. My manager already shut down this discussion once before, but I took the risk.”

“So, what did it sound like?” I wanted to know.

“You told me I would be okay as long as I spoke for myself. I knew my manager would cut me off if she began to feel uncomfortable, if she felt the discussion might get out of control. So that’s the first thing I talked about, speaking for myself.”

“And?”

“I told them I knew we had talked about this before and that it made me uncomfortable to talk about the project schedule. I looked around the room and asked each person to be patient with me. I told them my stomach was upside down, but I felt that if we, as a team, myself included, could tolerate the discomfort, I felt we could make some headway.

“Then, I repeated what we practiced two days ago. I looked straight at the ops manager. I said that I got a call from the client and she told me they were worried about the project schedule and that I was worried, too. I said I had a copy of the updated schedule, but that I didn’t know who updated it or how frequently it was updated. I said, speaking for me, I couldn’t tell if we were on-schedule or behind.”

“And what was the response?” I asked.

“It’s funny,” Deana smiled. “You could see the shuffling and the darting eyes, everyone else in the room was uncomfortable with me. One of the team rolled his eyes, as if to say, here-we-go-again. I looked straight at him, and said, ‘Bob, when you roll your eyes, it makes me feel like my opinion doesn’t matter. It makes me want to be quiet and for the meeting to just be over. I think this team, everyone in this room, has a stake in solving this problem for the client. I, for one, want to solve it. I want to understand. Here is what I have at stake. I am the primary contact for the client. The client has questions and if I don’t understand, then I can’t respond.’

“And the room was quiet,” Deana continued. “For a moment. Then the ops manager spoke.”
—–
BAMs is the mental state of a group. Non-work is collusive (pairing behavior), uncontrolled, irrational and UNCONSCIOUS. Teams go into BAMs to avoid a real issue. It is an unconscious behavior. One powerful way to shift the group back into work mode is to break the cycle of pairing behavior by speaking for yourself. It requires courage, but moves the team into a state of problem-solving. BAMs (Basic Assumption Mental State) was documented by Wilfred Bion in a tortuous book called Experiences in Groups.

Would You Say It, If It Wasn’t True?

“You described the situation with your team like a rubber band. Your team is stretched, trying to deal with the problem,” I said, “what do you think the problem is?”

“The problem is that we are behind schedule,” Deana stated flatly.

“What if I told you the problem with the team has nothing to do with the schedule?” I proposed.

“What do you mean? That’s the problem, the ops manager is manipulating the schedule so it looks like we are on-time when we are behind.”

“So, you are on the side of the project manager?”

“Yes. I mean, outside the meeting, without the ops manager, everyone on the team talked about it, and the truth is, the ops manager is manipulating the schedule,” Deana insisted.

“The truth?”

“Well, yeah, I wanted to check with other team members, get my facts straight and that’s what everybody thinks. When the project manager brought it up in the meeting, that is exactly the way he said it. He told the ops manager straight to his face, ‘Everyone in here thinks you manipulated the schedule.’ I don’t think he would say that unless it was the truth.”

“There’s that truth word again,” I smiled.

This is the story of a team in the classic struggle of BAMs. BAMs is the mental state of any group that drives its behavior. BAMs is in one of two states, work or non-work.

  • Work Mode vs. Non-Work Mode
  • Rational vs. Irrational
  • Scientific vs. Unscientific
  • Cooperative vs. Collusive
  • Controlled vs. Uncontrolled
  • Conscious vs. Unconscious

Deana’s team has a problem. In a classic move of non-work, the team mis-identifies the problem. The team does not have to deal with the real problem if it can create the appearance of working a different problem. The problem you solve is the problem you name. The team named the wrong problem.

I woke up this morning in a cold sweat. This is not the story of a team (your team). This is the story of a nation. This is the story of a nation in BAMs. Has the nation named the wrong problem?

The Team is Whispering

“So, tell me, Deana, if the ops manager is manipulating the project schedule, so it looks like we are on-time when we are behind, and if we can’t talk about it in the scheduling meeting, what will eventually happen?” I asked.

“It’s like a rubber band about to snap,” Deana replied. “The ops manager is so overbearing that everyone is terrified to bring it up, except the project manager. And my manager made it clear that if the project manager had a beef with the ops manager, they were to take it up outside the meeting, in private. So, it’s hands-off in the meeting.”

“Does this impact the team?” I wanted to know.

“Of course. How can we fix schedule delays, when the schedule says we are on-time?”

“What will happen?”

“I don’t know. The project manager is about ready to quit. He feels helpless, and no one on the team will support him, or even ask a question about it. More than one meeting got so tense that my manager squashed any kind of meaningful discussion. The rest of the team is whispering about all kinds of rumor-mill stuff at the water cooler.”

“How do you know all this?”

“People are coming to me privately. They feel like they can trust me. I mean, no one is stabbing anyone in the back, but if they are willing to talk about other people behind their back, what are they saying about me behind my back?”

“Why do you think your manager stopped the discussion in the meeting?”

Deana thought for a minute. “I think she was afraid of losing control of the team. I think if she allowed the confrontation to happen in front of the team, it might blow the team apart.”

“Tell me what is happening to the team,” I nodded.

“The team is coming apart anyway,” Deana concluded.

What’s Not to Talk About

“So, did your team deal with the issue, or did they avoid it and move on?” I repeated.

“Well, thank goodness my manager was there. When the project manager accused the ops manager of manipulating the schedule, no one knew what to say,” Deana replied.

“So, everyone checked out and looked to the senior-most manager in the room. Was the ops manager manipulating the schedule?” I asked.

“You know, no one is really sure. I was talking with one of my team members after the meeting and he thinks it was a big cover-up.”

“So, the situation was never resolved. We don’t know why we were behind schedule. We don’t if the schedule was accurate. We don’t know how to prevent this in the future.”

“What we do know,” Deana thought out loud, “if we are ever behind schedule and try to cover it up, we won’t talk about it in the meeting.”

Working Leadership comes to Austin TX. Ask me and I will send you a one page pdf about the program. Or you can follow this link to find out more.
Here are the dates –

  • Session One – Aug 25, 2017, 1-4:30p
  • Session Two – Sep 1, 2017, 1-4:30p
  • Session Three – Sep 8, 2017, 1-4:30p
  • Session Four – Sep 18, 2017, 1-4:30p
  • Session Five – Sep 22, 2017, 1-4:30p
  • Session Six – Sep 28, 2017, 9a-12p

To register, just ask Tom.

How the Team Avoids an Issue

“How do I know, working with my team, when we are dealing with a real issue?” Deana wanted to know.

“How does your stomach feel?” I asked.

“It feels fine,” she replied with a quizzical look.

“Then, we are just having polite conversation,” I nodded. “Have you ever sat in a meeting when someone said something that made you feel uncomfortable?”

Deana’s eyes glanced to the ceiling, then back to the conversation. She nodded with me. “Yep. We were working on a big project, tight deadline, behind schedule, angry client. In the meeting, the project manager jumped all over the ops manager, accused him of manipulating the project schedule to cover up the ops team being late. It was kind of creepy. Usually if someone has a beef with somebody else like that, they talk about it in private.”

“What impact did that have on the discussion?”

“Everything stopped. My manager was in the room. She called a halt to the meeting, said if they couldn’t get along, they would have to leave the meeting.”

“Then, what happened?”

“Everyone shut up and moved on to talk about the next project. It was under control, so things calmed down so we could finish our meeting.”

“So, what do you think was the real issue? And how did your stomach feel?” I prodded.

“So, if the conversation has my stomach doing flip-flops, then the team is probably facing a real issue?”

“And, did your team deal with the issue, or did they avoid it and move on?”

Working Leadership comes to Austin TX. For more information, follow this link.
Here are the dates –

  • Session One – Aug 25, 2017, 1-4:30p
  • Session Two – Sep 1, 2017, 1-4:30p
  • Session Three – Sep 8, 2017, 1-4:30p
  • Session Four – Sep 18, 2017, 1-4:30p
  • Session Five – Sep 22, 2017, 1-4:30p
  • Session Six – Sep 28, 2017, 9a-12p

For registration information, ask Tom.

How to Cripple a Team

From the Ask Tom mailbag-

Question:
Faced with a problem to solve, my team never really comes up with anything. Sometimes it seems they just want me to tell them what to do so they don’t have to think. We are really busy, so most times, I give in, tell them the answer and get them back to work. But, at the end of the day, I am exhausted.

Response:
Of course they want you to tell them what to do. If you tell them what to do, then they are not responsible for the solution. Every time you solve a problem that the team should solve, you cripple the team from solving the next problem.

It’s a tough assignment for you to turn down. You get all the glory, you get to strut, you get to be the head Fred, you get to be the go-to guy when there is a problem to solve. It feels good AND it destroys your team.

Most of all, your team likes it that way. They are relieved of the difficult decisions.

This is not just a method called team problem solving, this is a mind-set on the part of the manager. If you want to build a team, give them a problem to solve. As the manager, you may have to help define the problem, facilitate alternate solutions and ask questions related to the best solution, but let the silence do the heavy lifting.

I can always tell a team is stuck when they fail to solve the same problem they had a year ago. I can always tell a team is growing when they trade in the problems from a year ago (now solved) for a new set of problems for tomorrow. -Tom

Stars Can Win Trophies

“Look, I have the best engineer, I have the best mechanic, I have the best designer, I have the best installer,” Ted complained. “Then why do we get such mediocre production?”

“I don’t know, what do you think?” I asked.

“We just can’t seem to make our numbers,” he started. “It’s like we have all the best talent, but just can’t put it all together.”

“So, it’s the putting together part?”

“Well, yeah.” Ted stopped. “You’re right, it’s not the talent part, it’s the putting together part. They don’t sync up, they are all running in a different gear. They don’t relate.”

“So, you just found your constraint? How well you connect is how well you do as a team. Your production will never be as good as your star player. It doesn’t matter how well your star plays. Individual stars can win a trophy, but it takes a team to win a championship.”

Requires a Conscious Mindset

“So, how do I get the team back to productive work?” Miriam asked.

“Facing the issue of having to work together, in a conscious, cooperative way, takes effort,” I replied. “It doesn’t happen by itself. As the manager, when you push the issue back to the center of the table, there are four predictable responses. The team will go into fight or flight. They will freeze or appease, not necessarily in that order.”

“I just have to outlast the panic,” Miriam remembered.

“To work together, the team has to change its belief about the way it works together. Culture starts with the way we see the world, the way we see our circumstances. Teams that work together have a different mindset. They don’t cooperate (for long) because we tell them to. They support and help each other because they believe that is the way things are done around here. It may not be comfortable at first, but high performing teams not only live with the discomfort, but create rituals to meet adversity head on. I can always tell a team is making progress when they trade in (solve) old problems for a new set of problems.” -Tom

Level of Work of a Team Lead?

From the Ask Tom mailbag –

Question:
I run a private industrial disaster recovery business. We respond to natural disasters and clean up the mess. We are very hierarchical, but I am having difficulty understanding the level of work in the teams that we dispatch.

Is it possible to have a supervisor in stratum level one? For example, we deploy teams of three people consisting of two technicians and a team captain. The two technicians are obviously working at S-I, one or two day time span, while the team captain works on a day to week at the most. The team captain directs the activities of the two technicians, but is he their manager?

We have several three person teams supervised by a single Project Manager. The Project Manager role, for us, includes team member selection, coordination of support resources, equipment, machinery, consumables as well as training for technicians and team captains. Our Project Manager clearly works at S-II, 3-12 month time span.

My question is, what is the level of work for the Team Leader?

Response:

You describe a classic case of a First Line Manager Assistant (FLMA). Elliott was very specific about this role. You are correct that the role is an S-I role and illustrates that within a single stratum level of work, we have different levels of work, illustrated below –

S-II – Project Manager, supervision and coordination, manager of the entire S-I team.
————————————————
S-I-Hi – Team Captain, directs on-site, assigns tasks, but is not the manager of the team.
S-I-Med – Technician, works under the on-site direction of the Team Leader
S-I-Lo – Technician trainee
————————————————

This works for project teams, deployed field units, multi-shift operations where the S-II Project Manager or Supervisor is not physically present at all times. The First Line Manager Assistant (FLMA) has limited authority to direct activity and assign tasks within the larger authority of the S-II Supervisor. The FLMA has recommending authority for advancement and compensation, but those decisions remain with the S-II Supervisor.